Current projects
Overcoming soil biological constraints to yield (2002-2006)
Biological indicators of soil quality (2002-2006)
Identifying benefits of composted soil amendments to vegetable production (2001-2004)
Quantifying the re-establishment of soil processes and the impact of fire management on rehabilitated bauxite mines in Western Australia (2004-2006)
Maintenance of Australias soil resource water, microbial diversity and function (2004-2006)
Optimising mine floor strategies for diverse regolith types to enhance rehabilitation success: Faron Mengler (ARC Linkage project: LP0214954)
Embankment erodibility study examining the susceptibility of constructed embankments to erosion and evaluation of amelioration methods at the Worsley Alumina Refinery (2004)
Pre-mine survey and characterisation of soils in the Brockman Ridge mining lease area (Ecologia Environmental Consultants / BHP Biliton) (2004)
Fertiliser application study examining method and timing of fertiliser application to rehabilitated forest areas at Boddington Bauxite Mine, (Worsley Alumina Pty Ltd) (2003 Present)
Deep ripping investigation involving the assessment of soil ripping techniques on soil structure development and root growth in rehabilitated forest areas at Boddington Bauxite Mine, (Worsley Alumina Pty Ltd) (2003 Present)
Investigation of hardsetting properties of reconstructed soil profiles at Yoganup Extended Mine Site (Iluka Pty Ltd) and effect of soil amendment materials on these properties (2002 Present)
Preliminary investigations on the potential causes of dieback of eucalyptus tetrodonta at Gove
Assessing Minesoil Rejuvenation: Survival of Arbuscular Mycorrhizal Inoculum in the Presence of Eucalyptus Hosts at Ensham mine, Emerald, Queensland Hydrocarbon Remediation on Barrow Island Rehabilitation of Bauxite Residue Storage Areas (BRDAs) at Worsley Refinery, involving the assessment of capping material options and vegetation parameters.
|